Logo
Australis Oil and Gas Investor Hub

How we got here

  1. 2016

    Entry into the Tuscaloosa Marine Shale

    Australis lists on the ASX in July 2016 and takes its first position in the TMS, an underexploited oil play on trend with the Eagle Ford shale and with a similar depositional history, age and setting.

  2. February 2017

    A core acreage position built

    The acquisition of Encana’s remaining TMS assets and a focused leasing program takes Australis past 100,000 net operated acres in the TMS Core.

  3. 2018 – 2019

    Six wells drilled in the TMS

    Australis drills 6 wells in the TMS. Results support the productivity assumptions and validate the well engineering design.

  4. November 2025

    Partnering and financing secured

    A US listed partner has the right to fund a US$46.25 million drilling and completion program, carrying Australis at a 20 per cent working interest, in order to earn an 80 per cent working interest in Australis’ 46,100 undeveloped operated acres. A separate financing transaction is agreed, which completes on 31 December 2025, monetising the majority of operated production, allowing Australis to repay debt in full and further funding future development beyond the carry.

  5. January 2026

    Independent reserves and resources assessment

    The independent Ryder Scott report, effective 31 December 2025, sets out approximately 62 million barrels of 2P reserves and 2C contingent oil resources net to Australis across the acreage.

  6. 2 July 2026

    Willson 1H permit filed

    The permit application for the first carried well is submitted to the Mississippi State Oil and Gas Board. Willson 1H is proposed as a 10,000 foot lateral from an existing but previously unused pad, into a new drilling unit of approximately 1,900 gross acres.

  7. 15 July 2026

    Willson 1H permit granted

    The Mississippi State Oil and Gas Board grants a permit for the Willson 1H, the initial well under the carried work program. The Willson 1H is permitted as a 10,000 foot lateral in a new drilling unit of 1,900 gross acres, with Australis and its development partner holding more than 95 per cent of the unit acreage, and will drill from an existing but unused pad.

  8. 19 August 2026 · we are here

    A second permit granted and a third underway

    Permit granted for the second planned well under the carried work program, the Mathieu 1H, and the permitting process for a third carried well, Baker 1H, has commenced.

Analyst research report

We have commissioned a research covering the valuation of the company, the strategy behind our acreage position, and why we believe the opportunity exists now. It is free to read and download now.

Read the research report

Questions we are being asked

The twenty questions that come up most often, answered in full. Filter by topic or search for a term, then open the ones that matter to you.

Australis

Is the Australis leadership team experienced in the US unconventional industry?+

Our leadership team has decades of experience in the US unconventional industry prior to their time with Australis, across a range of public and private oil and gas companies. You can read their full biographies on our Board and Management page.

Key members of the Australis board and management ran another ASX listed oil and gas company with unconventional assets in the US called Aurora Oil and Gas Ltd. Aurora was involved in the very early exploration drilling in the Eagle Ford shale and eventually partnered with Marathon Oil, participating with around a 25% working interest in over 500 wells and raising hundreds of millions of dollars in debt and equity capital to fund development. Aurora was sold in 2014 for A$1.6 billion to a Canadian company called Baytex Energy, delivering a significant increase in shareholder value over its initial A$30 million market capitalisation.

What is the business strategy of Australis?+

Australis has had a clear and simple business strategy from inception: to identify a low cost but high quality, early stage unconventional oil play in the US, to build a meaningful position in that play, to secure a partner to help fund the early stage development, and to generate shareholder value.

Tuscaloosa Marine Shale

What is the TMS and where is it located?+

The TMS is an organic rich formation located on the Cretaceous shelf margin, similar in geological age to the Eagle Ford shale. It has a depositional area of around 20 million acres and sits primarily across central Louisiana and southwest Mississippi. You can see it mapped on our Tuscaloosa Marine Shale project page.

In 2018 the US Geological Survey estimated the TMS covered 20.4 million acres with a mean estimated recoverable resource of 1.5 billion barrels of oil and 4.6 trillion cubic feet of gas.

Why did Australis choose to enter the TMS?+

We believe the TMS is one of the few remaining undeveloped shale basins in the onshore US with significant reserve potential that met the criteria for investment under our corporate strategy.

Within the larger TMS depositional area we have identified a smaller TMS Core area of approximately 600,000 acres straddling the Mississippi and Louisiana border. Based on historical production and evaluation of subsurface and technical data, the best producing TMS wells have been located here, with production performance that matches the Tier 1 wells of more established shale plays. Our acreage sits within this production defined TMS Core, and we were able to enter and have maintained a strategic position at a very low cost when compared with the established shale plays.

Why has the TMS not been developed already?+

Early attempts by EOG and Devon to evaluate the play used the Eagle Ford shale as an analogue and took positions outside the TMS Core. Their results were variable, as the TMS has a relatively complex depositional history and at that time the play was considered deep and hot.

When EOG and Devon departed, several companies continued their appraisal programs and delineated an area with consistent productivity in the shallower part of the play. This TMS Core became the focus of drilling in 2014, with nearly 50 wells drilled that year as the play reached the critical transition from appraisal to early stage field development. However, when the oil price dropped in late 2014 and 2015, the incumbent operators were forced to streamline their operations and activity in the TMS came to a halt.

What is the potential of the TMS Core?+

Within the production delineated TMS Core, the average well performance of wells drilled by Encana in 2014 was on par with or better than wells being drilled at the same time in areas designated Tier 1 in established oil plays such as the Eagle Ford, Bakken and Permian. That is despite the wells in those plays having optimised designs drawn from a large well count, against a TMS that had seen only 80 wells in total by the end of 2014.

Applying modern techniques at scale to the development of the TMS Core has the potential to create hundreds of high quality wells under full field development. On the roughly 47,000 acres currently held by Australis alone, under our current spacing assumptions, there would be around 150 such future premium production wells, and Ryder Scott have estimated a mid case contingent resource of over 62 million barrels.

Why has it taken this long for Australis to find a partner for its TMS project?+

The first two steps in the business strategy described above were successfully executed with our position in the TMS. But when we started engaging with potential partners in late 2019, two key factors came to bear.

  1. The industry had transitioned from a growth orientated business model to one focused on shareholder returns. Instead of seeking new areas and opportunities to deploy capital quickly and grow production, companies focused on existing positions and lower risk, although more expensive, expansion opportunities within established unconventional plays. The appetite for early stage opportunities such as the TMS was very limited, and even when due diligence teams recommended to executive teams that they proceed, there was simply no appetite for taking on new areas.
  2. In early 2020 the COVID 19 pandemic hit, the oil price collapsed and many companies significantly pulled back on development activity. This was a significant headwind through the period from 2020 to 2022.

The challenge for the industry with the new business model is that it is not sustainable. The established plays are finite, they had naturally been high graded, and the remaining quality drilling inventory became limited. That forced companies to start considering new areas, and we first observed this evolution in 2024 and 2025.

The US unconventional industry

What is an unconventional well, and how does it differ from a traditional oil and gas well?+

Conventional oil and gas requires four key factors to all work together.

  1. Source rock. This rock contains the organic material that, over a geological time span, is converted to oil and gas. Over many millions of years the higher pressure hydrocarbons generated are expelled from the source rock into the surrounding formations.
  2. Migration route. Hydrocarbons are lighter than the water sitting in the pore space of the surrounding formations, so they have a natural tendency to rise to surface, and a great deal of hydrocarbon has done exactly that over time. But some rock properties provide a barrier and force the hydrocarbons to move laterally away from the source rock. That is a migration route.
  3. Trap. Occasionally the rock properties that force the hydrocarbons to migrate away from the source rock create a geometric trap, where the hydrocarbons have nowhere to go and simply accumulate within a contained area.
  4. Reservoir. If that contained area has rock properties that allow hydrocarbons to be produced from penetrations, meaning wells, then the combination of all four elements generates a viable hydrocarbon find.

Conventional exploration requires all four elements to be mapped successfully. Technology has advanced significantly to improve the chances of success, but it cannot overcome the necessity of all four elements being in place. Until now.

Unconventional oil and gas misses out the last three elements and targets the source rock itself. By its very nature the source rock is extremely unlikely to have the reservoir characteristics needed to work, but artificial stimulation, or fraccing, creates those characteristics, and long horizontal wellbores within the source rock create sufficient exposure to generate economic returns. The technologies to do this were developed in the 1990s, but it was not until the late 2000s that they were successfully combined and implemented. Not all source rock is suitable for unconventional development, and generally there are more gas source rocks than oil source rocks that are suitable. Even so, this has proven to be a game changer for the industry, particularly in the US where the commercial structure makes unconventional development more attractive.

If the US is producing so much unconventional oil, why would companies be interested in a new play?+

The growth in US unconventional oil production has been meteoric and has had a significant impact on global oil trade, but it has been remarkably concentrated in just three plays. The Bakken, Eagle Ford and particularly the Permian have accounted for over 85% of US unconventional oil production for a number of years. That concentration has allowed significant cost savings and manufacturing type efficiencies to be brought to bear.

However, although the resources in place are vast, they are finite, and the number of wells and the amount of oil that can be recovered is limited. Participants have naturally been high grading their own inventory and significant corporate consolidation has taken place. The net result is that remaining quality drilling locations are becoming scarce, highly sought after and therefore expensive. As the balance has shifted, companies have been forced to look elsewhere and alternative options are being evaluated.

What is a lease, and what is HBP status?+

In most global jurisdictions, including Australia, mineral rights are owned by state or federal authorities. Those authorities license the right to drill and produce, and state and federal law then dictates the payments that have to be made by the producer on the volumes recovered. In the US, mineral rights are predominantly owned by private landowners, with only small amounts held by state or federal government entities. Oil and gas companies therefore generally must acquire the rights to explore, drill and produce hydrocarbons from the mineral rights owner rather than from the government. Australis has acquired nearly all of its acreage from mineral rights owners, a small amount from state entities and none from federal entities.

An oil and gas lease is the legal contract by which we acquire the legal rights to explore, drill and produce hydrocarbons. The key terms of a lease include the bonus payment, the royalty rate and the lease term. The bonus payment is consideration paid up front to secure the lease. The royalty rate is the amount of gross revenue from production to which the mineral rights owner is entitled, expressed as a fraction or a percentage of revenue. The lease term is the duration of the lease, which typically has an initial term of one to five years that expires unless a well is drilled and completed in the leased mineral acreage, or in acreage that has been pooled with it to form a production unit around a well.

If such a well is drilled, the term of the lease is maintained for as long as the well continues to commercially produce hydrocarbons, and the leased acreage is considered Held by Production, or HBP. A production unit will typically contain a number of pooled leases, each of which will have HBP status. The unit also typically contains the space for additional wells, which means the lease holder has the right to drill any future wells inside the unit for as long as that HBP status is maintained.

What is a farmin deal?+

A farmin deal is a common oil and gas transaction where one party acquires, or farms into, an interest in acreage held by another party in exchange for fulfilling an obligation at a future date, rather than paying cash consideration up front. Most often that obligation is to pay the costs of a specified development program on the acreage, including the acreage holder's share of those costs, up to the agreed value of the interest being acquired. Full legal ownership of the interest only passes once the agreed value has been fully spent. Farmins are a common way for companies to develop large positions without dilutive capital raises.

The Development Agreement

Who is the Development Partner?+

The Development Partner is a US listed independent oil and gas company with a multi billion dollar enterprise value and active onshore development and exploration operations in multiple US unconventional basins. It has significant daily oil weighted production of hundreds of thousands of barrels of oil equivalent per day and an annual development capex budget in the hundreds of millions of dollars.

Why has Australis not identified its Development Partner?+

The Development Partner has requested not to be identified publicly at this time, and we have agreed to respect its wishes.

What are the key terms of the Development Agreement?+

The most significant part of the Development Agreement is a farmin deal, whereby the Development Partner will farm into our TMS acreage position by paying 100% of the costs of new development up to an agreed total cost. To earn an 80% working interest in approximately 46,100 net acres held by Australis, the Development Partner must pay for the costs of a drilling program that results in it carrying Australis for a total of US$9.25 million at a 20% working interest. That corresponds to a total of US$46.25 million in joint development costs to be spent by the Development Partner.

The Development Partner will also spend US$1 million on a leasing program in the TMS Core, carrying Australis for a 20% working interest in the leases acquired.

Another important term is the formation of an Area of Mutual Interest, or AMI, in the TMS Core, allowing for cooperative future leasing within the AMI. The formation of an AMI and the carried leasing program are key features that allow us to increase our acreage position in the TMS Core following a successful farmin.

Read the full announcement for further important details on the Development Agreement.

How long will it take for the Development Partner to complete its farmin obligations?+

The actual timing will depend on several factors, including the availability of rigs and the other key materials and service providers required to complete development. The date on which the Development Partner meets its spending obligations will also depend on the actual development costs per well and the rate of drilling activity. However, the Development Agreement does provide a framework that sets a maximum time period by which those obligations must be satisfied, starting at the point the initial well of the program is drilled and completed.

The Development Partner must drill and complete the initial well of the development program by 31 October 2027. Within six months of that occurring, it can elect to continue the development program in order to earn the acreage. If it so elects, it has 36 months in which to meet its total spending obligations, and must drill and complete at least one well in each calendar year during that period.

How many wells will Australis be carried for under the Development Agreement?+

This depends primarily on how much each well costs and whether there are other participating working interest partners in the wells. Australis is carried for US$9.25 million of costs in the first US$46.25 million of joint costs, corresponding to an allocation of a 20% working interest for Australis and an 80% working interest for the Development Partner.

If the wells are owned 100% by Australis and the Development Partner together, and using our assumptions for the well cost of a continuous rig program in a single unit with 7,500ft laterals, this would equate to four or five gross wells, in which Australis would have a 20% working interest. Drilling longer laterals, putting each new well in a new unit, or drilling the wells on a non continuous basis would make the wells more expensive and would reduce the number of wells on which we are carried.

Who will fund the Willson 1H well?+

The Willson 1H will be 100% funded by the Development Partner under the farmin terms. Australis will be carried for a 20% working interest and will be entitled to the revenue that interest entitles when the well starts production.

What does Australis retain once the Development Partner completes its farmin obligations?+

If the Development Partner completes its fiscal and timing obligations under the farmin agreement, Australis will assign 80% of its working interest in 46,100 net acres. We will retain the balance of a 20% interest in those acres, plus approximately 2,000 net acres that were excluded from the agreement. In addition, we will hold a 20% working interest in any incremental leases acquired following the agreement date as part of the carried land program or AMI leasing.

When will we know if the well has worked?+

There will be several key milestones during well operations that will be assessment points for the Willson 1H.

  1. The data gathered will provide new insight into the reservoir characteristics. While we expect an incremental gain on knowledge already gathered from early wells, it will be important for long term planning.
  2. The drilling program will provide a further test of the engineering design for the well. Several newer technologies will be tested during the drilling phase, and the permitted lateral length of 10,000ft would be a record if achieved.
  3. The completion design is very different from that used historically in the play, so the execution and of course the subsequent well performance are key assessment points. One point to note is that we expect higher water cuts from this type of completion design during the early flow back, which means it may take longer to establish oil production rates than with older designs.
What happens after the initial test well?+

We expect a period of assessment to occur before the next wells are drilled. The farmin agreement allows for a maximum six month assessment period before the Development Partner has to elect to continue, and then requires at least one well to be drilled a year. In preparation for the next steps, well 2 (Mathieu 1H) has been permitted and the permit process has commenced for well 3 (Baker 1H).